A design project for brine extraction and transport in salt pans, for a 1 million ton / year potash

Source: Changsha Design and Research Institute
Date:2012-04-18

This project is a first in China in the following ways:

transporting highly mineralized brine with a large vertical pump from a salt lake;

building a 100m by 14km, full-face, seepage-proof brine transport canal;

using heavy-caliber,long-distance UPVC pipe in a salt marsh on a plateau, instead of steel pipe.

 